Lead paint stabilization is a method of interim control. Unlike lead paint abatement, stabilization and other interim controls are meant to temporarily reduce exposure to lead paint hazards. Repairing physical defects that cause paint deterioration, removing loose paint and other material from surfaces containing lead paint, and applying new paint or protective coatings are all methods of stabilization.
Stabilization and other interim controls are generally favored over permanent abatement when the lead paint-containing surfaces are intact and the building is structurally sound, or if the building containing the lead hazard is slated for demolition or renovation within the next few years. In situations such as these, lead exposure results primarily from chipping paint, lead dust, and/or lead-contaminated soil, and stabilization is sufficient to remove the lead hazard. Lead paint stabilization is also sometimes used when permanent abatement is not financially possible.
Despite its advantages, there are some requirements and regulations that must be observed when performing lead paint stabilization. Anyone performing lead paint stabilization must be trained according to the Occupation Safety and Health Administration’s Hazard Communication requirements, and must either be supervised by a certified lead paint abatement supervisor or have completed a U.S. Department of Housing and Urban Development (HUD)-approved training course. In addition, when performing lead paint stabilization, there are three operations that must be performed. First, any physical defect in the paint surface which may be causing deterioration must be repaired. Then, any loose paint or other material on the paint surface must be removed. Finally, a new protective coating must be applied.
Anyone performing lead paint stabilization must also observe HUD safe work practices. The HUD safe work practices have four components: occupant protection, worksite preparation and containment, prohibited methods, and worksite cleanup. Occupant protection involves protecting occupants of the home or building where the lead paint is being stabilized from dangerous exposure to lead. Occupants must not enter the worksite during stabilization, and in some cases may need to vacate the building entirely for the duration of stabilization activities. The occupants’ belongings must also be covered or sealed to prevent them from being contaminated with lead dust. The second component of safe work practices, worksite preparation and containment, involves with making sure the worksite is properly prepared to ensure that lead dust and lead-contaminated debris do not leave the worksite during stabilization activities. Warning signs must also be placed at each entrance where Lead Hazard Reduction activities are being performed. Prohibited methods, the third component of safe work practices, is put in place to ensure that unsafe methods are not used to stabilize lead paint. Prohibited methods of work include power sanding or aggressive mechanical means of lead paint removal without proper vacuum recovery of dust. The final component, worksite cleanup, involves removing all dust and debris from the work area, using approved methods, and ensuring that it is safe for occupation.
Asbestos can be found in many materials throughout a single building. asbestos abatement ny http://www.amacinc.com/asbestos_removal.html
ReplyDeleteNice post. I was looking like this. Really it is very useful and informative post. Thanks for sharing. Thanks again! get redirected here
ReplyDeleteCOPD (chronic obstructive pulmonary disease) is long term degenerative disease. There are several types of treatment for this disease. If you need the best treatment of this disease then visit this link-Stem cell COPD therapy
ReplyDeleteIt has been simply incredibly generous with you to provide openly what exactly many individuals would’ve marketed for an eBook to end up making some cash for their end, primarily given that you could have tried it in the event you wantedOccupational health and safety course in chennai
ReplyDeleteHeat shock factor -- which exists in a single form in invertebrates but multiple forms in vertebrates -- is an essential part of the ability of living cells to survive stressful conditions such as heat, cold, radiation, and, it turns out, desiccation. In desert insects, the researchers found, the gene is able in certain conditions to upregulate itself, and this upregulation leads to a number of downstream processes, including the synthesis of heat shock proteins that are able to protect proteins in the cell from misfolding. testing machine
ReplyDeleteIf you ever want to take some of the load off, I’d like to write some material for your blog in exchange for a link back to mine. Please shoot me an email if interested. Thanks.
ReplyDeleteindustrial safety courses in chennai